First Stage of the College Master Plan Announced – Jennifer Oaten

A dedicated team has worked very closely with our architects, Edgar Idle Wade, in a comprehensive process to develop the College Master Plan 2019-2029. We are delighted to share with you the outcome.

The photograph below shows the College shortly after it was established in 1938, very isolated and with few other buildings nearby. What foresight the Sisters of Mercy had!

Over the past 10 years much development has occurred with the following key developments being completed.

In developing the Master Plan, seven key considerations assisted in our decisions

  1. Preserving our History
  2. Building Community
  3. Embracing sustainable design practices
  4. Empowering future learning directions
  5. Re-visioning current buildings
  6. Developing exemplary, multi-purpose new facilities
  7. Enhancing the campus environment for all

The Process

 Establishing an effective masterplan involved multiple groups in a series of ‘Building Ideas’ workshops, an essential part of the consultation.

The workshops were held with:

  • A volunteer student group of 36 girls that spanned all year groups
  • Staff groups that included leadership, support staff and teachers
  • The broader College community through College Advisory Council members and selected parents.

An extensive survey was developed for the three different groups, and the participation level exemplified the interest and enthusiasm from the College community.

  • Students (629 responses)
  • Parents (63)
  • Support Staff (19)
  • Teaching Staff (43)

The preliminary planning concept introduced the idea of different precincts being developed across the site. These concepts were workshopped by the College. This resulted in the refinement of the planning concept and the proposed staging.

As each concept was identified, the guiding principles below were used to provide an assessment of priority as follows:

The First Development

The first development of our Master Plan will be to refurbish the Chapel and to build a Performing Arts Community, which will include a theatre and teaching spaces for Drama, Dance and Music. This development is planned to commence in 2022.

RATIONALE

Refurbishment of the chapel  and development of a Performing Arts Community has been prioritised for the following reasons:

  • The chapel is the spiritual centre of the College, and this signifies to our community its importance.
  • The existing theatre is limited in capacity for events and performances, undersized for storage and outdated in terms of technology and staging/mixing facilities.
  • Currently, many events and performances are held in McDonald Building, which impacts on Physical Education classes and IGSSA for setup and pack up of events.
  • This development provides a purpose-built theatre with exemplary rehearsal and performance spaces for Dance, Drama and Music enabling the many students involved in performing arts in both their academic and co-curricular programs to develop and showcase their talents.
  • Performing arts learning programs are currently held in the McAuley Building. It is not purpose-built for practice, rehearsals or performances and the acoustic treatment of the space is non-existent.
  • The new development incorporates digital technology to expand the offerings for student performance, creative staging design, learning spaces and media production.  
  • It incorporates spaces for community engagement, examinations, House and Year group gatherings, social and professional gatherings, so all students, staff and the community will benefit from this development.
  • The development will free up the McAuley Building to be utilised as a general learning community.

FACILITIES 

It is likely the new facilities will include:

  • Theatre
  • Multi-use foyer
  • Music lesson and practice rooms
  • Dance and drama studios
  • Performance spaces
  • Technical and design spaces
  • Make-up room
  • Props and costume storage
  • Instrument and music storage
  • Teaching spaces

Looking Forward

This is the first of a number of builds that will occur in the next ten years. As a Master Plan evolves over time, particularly in relation to available finances and needs of the College, details of further stages will not be released at this time. However, the next two developments are likely to be a Years 5 – 7 Learning Community and revisioning of our heritage, McAuley Building.

What A Term! So Many Opportunities – Jennifer Oaten

As I look back on the past nine weeks, I am so grateful for who we are as a community and what we have achieved. Through the dedication of our staff and the enthusiasm of our students, we have established new connections, immersed ourselves in opportunities and worked through challenges.